Executed Projects
Contact Us
Iraq - Baghdad , Karrada, Al-Warka, Bldg 2nd Floor, flat13.
Telephone:+964.1.7191459
+964.1.7175295
+971.50.8988935
Mobile:+9647901943717
Fax:+964.1.7191459
Projects
A summary of selected executed projects and experiences undergone are listed below:
INTERNATIONAL COMMITTEE OF THE RED CROSS
-Supply, erection & operating the Al-Noor water treatment compact unit in Diyala Governorate at 2003, the work include all the mechanical and electrical installations.
- Construction of Al- Ummal sewage pump station and extend pipe network size 600 mm diameter for length about 2000m in Diyala Governorate at 2003.
-Lay and extend pipe network size 300 mm diameter for length about 5000m in Sarajiq city (Diyala Governorate)in 2004
-Rehabilitation of Old Baquba water treatment plant and extend pipe network in Diyala Governorate in 2004
-Installation and operating new water pumps ( Large capacity-720 m3/hr) , submersible pumps and chlorine units in ABU TIBAN water treatment plant ( 3000 m3/hr) in Al-Anbar Governorate, the work include supply and installation of new D/Y & soft starter with all electrical connection for water pumps. The work started and completed in 2009.
-Supply, installation & operating new reverse osmosis 12 m3/hr water unit (RO) in AL-Waleed Area- Al-Anbar Governorate at 2008 , the work include all mechanical and electrical connection and extend new pipe network size 100 mm diameter for length about 1000 m.
-Installation and Operating new water pumps (High capacity -1000 m3/hr) with electrical connection to soft starter for Al-Ramadi water treatment plant (6000 m3/hr) , the work include supply and installation new chlorine unit, booster pump, alum dosing pump and foot valve size 500 mm. the work started and completed in 2009.
-Rehabilitation and upgrading the Al-Haj Dawood Al-Janabi PHCC (Primary Health and Care Center) in Baghdad governorate in 2009.
-Installation and operating new well pumps and electrical generator with all electrical connection in AL-Rutba City _ Al-Anbar Governorate this was implemented in 2009
CARE INTERNATIONAL IN IRAQ
-Rehabilitation of Shehimiya compact unit (water project)/Wast governorate at 2004.
DIYALA WATER DIRECTORATE
-Erection and installation all mechanical works in Baladroz Project (6000m3)/Diyala governorate at 2006. The work included were laying and extending all ductile iron pipe network inside the plant area.
MINISTRY OF OIL
-Extended oil pipes (2000m in Al-Basrah as Sub contractor).
RUSSIAN CO. (EIS)
-Rehabilitation & maintenance of some parts in the South Baghdad, Dura and Musaib heat electrical power station in Baghdad governorate at year 2004, 2005 & 2005 respectively.
-Provide technical and logistic support to EIS and provision all required mechanisms, technicians and workers to work in the South Baghdad power station.
-Implement all welding works for steam boiler tubes in electric power stations that above-mentioned.
-Extension of electrical cable with different types and sizes for long distance in Dura and Musaib heat electrical power station.
MINISTRY OF INDUSTRY AND MINERAL
-Supply and install switch gears of the electrical substations in Al-Muthana governorate at 2003.
-Perform mechanical works in Al-Shaheed factory-Faluja in the year 1991.
MINISTRY OF INTERIOR AFFAIRS
-Construction of police station with all accessories in Al-Anbar governorate at 1998.
MINISTRY OF IRRIGATION Ministry
-Construction of stream gate in Al-Rifa’ae enterprise/ Thiqar governorate in 2002
MINISTRY OF HIGHER EDUCATION & SCIENTIFIC RESEARCH
-Supplying and installing central cooling system including five package unit to Karbala University at 2011.
-Implemented many projects of (Excavation and Filling)in Kut, Baqoba, Nasiriya, Faloja & Najaf the total quantity for these projects evaluate in about30,000,000 cubic m.
Contact Phone:
+964.1.7191459
Copyright © 2011 almensr.com. All Rights Reserved. Powered By Orion.